BRT: Anderson Road

CLIENT
eThekwini Transport Authority

ARCHITECT/ENGINEER
MCA Joint Venture

VALUE AT COMPLETION
R 293 mil (In JV with Thekwane, Oteo, Phakama, Ngosi Trading and Lakeshore)

LOCATION
Pinetown, KZN

PROJECT TYPE
Roads & Bridges

DESCRIPTION
Section 1 runs along Josiah Gumede road (old Main road), from Anderson road to Beviss road and consists of the dedicated ROW lanes for the new Integrated Rapid Public Transport Network, a total length of Section 1 is 1550m and is the main carriageway through Pinetown CBD.
Section 2 runs along Anderson road from Josiah Gumede road to Davidson road south and is 400m in total.

CONTRACT PERIOD
May 2014 – December 2015

Silo 3,4,5

CLIENT
V&A WATERFRONT HOLDINGS (PTY) LTD

ARCHITECT/ENGINEER
MLC QUANTITY SURVEYORS

VALUE AT COMPLETION
ZAR 500 Million

LOCATION
V&A WATERFRONT, CAPE TOWN

PROJECT TYPE
Building

DESCRIPTION
The construction of 35000m2 of new office, gym &
residential space within the Clock Tower precinct of the V&A
Waterfront

CONTRACT PERIOD
March 2015 – September 2016

Swartruggens N4 – Phase 2

WBHO has successfully completed Phase one which consisted of the realignment and rehabilitation of 25km of the N4 between Rustenburg and Swartruggens. Phase two consists of an additional 25km of the N4 just outside of Rustenburg. The project is being constructed while the existing N4, a major artery into Botswana, remains open to commuters. Construction is being conducted in half widths to minimize stop/go systems in combination with diverting traffic onto temporary traffic accommodation shoulders. The scope of work entails breaking up the existing pavement layers which are then recycled to form an insitu roadbed on which the layerworks for the new road are constructed.
Contract Duration: May 2013 - October 2014
Contract Value: R160 Million
Engineers: Jeffares & Green
Client: Bakwena Platinum Corridor Concessionaire (Pty) Ltd
Location: Rustenburg/Swartruggens

Watson Highway Link Road

This Link is a dual road with a median to allow a future rapid transport lane or rapid transport system to be placed between the two lanes. This road is 3.4 km long and will link the Dube Tradeport’s Tradezone area at King Shaka International Airport with the Watson Highway, which links Tongaat with the N2. The scope of work included the construction of a proposed MRO or aircraft maintenance area. All the MRO cut (about 380,000m3) was used to create fill platforms for future expansion of Dube Tradeport. The bulk earthworks for the road was more than 820 000m3
Contract Duration: May 2012 - Oct 2014
Contract Value: ZAR 187 Million
Engineers: Virtual Consulting Engineers
Client: Dube Tradeport
Location: Watson Highway, Kzn

Lynnwood Bridge phase 3

Lynnwood Bridge phase 3 is the third and final phase of the Lynnwood Bridge complex. There are five basement levels and office accommodation in two 5-storey tower blocks built off the podium

Contract Duration:
August 2012 – August 2014

Contract Value:
ZAR 30 Million

Engineers:
Aurecon

Client: 
Lynnwood Bridge Office Park (Pty) Ltd

Location:
Lynnwood, Pretoria

Mopani Acid Plant

WBHO (Zambia) Ltd was awarded the civil works for the new acid plant and gas cleaning plant for Mopani Copper Mines in Mufulira, which is a small town in the Copperbelt province situated 40km from Kitwe and 60km from Chingola. The project commenced in November 2012 and was carried out over various phases, comprising some 11000m3 of concrete works in total.
Contract Duration: 16 Months
Contract Value: ZAR 110 Million
Engineers: SNC Lavalin Canada
Client: Mopani Copper Mines
Location: Mufulira, Zambia

Trade Centre

EMPLOYER
Cape Gate

CONSULTANT
Stauch Vorster

YEAR COMPLETED
2004

VALUE AT COMPLETION
R29M

LOCATION
South Africa, Cape, Oostenberg

PROJECT TYPE
Retail

DESCRIPTION

Woolworths Distribution Centre

EMPLOYER
Woolworths (Pty) Ltd

CONSULTANT
R L Architects

YEAR COMPLETED
2007

VALUE AT COMPLETION
R241M

LOCATION
South Africa, Gauteng

PROJECT TYPE
Retail

DESCRIPTION


Bedford Shopping Centre

EMPLOYER
Hightower Properties

CONSULTANT
BKA Architects

YEAR COMPLETED
2004

VALUE AT COMPLETION
R120M

LOCATION
South Africa, Gauteng

PROJECT TYPE
Retail

DESCRIPTION
Alterations and refurbishment of shopping centre



Temba Pipeline

EMPLOYER
Roodeplaat Temba Water Services Trust

CONSULTANT
Temba Roodeplaat Consulting Consortium

YEAR COMPLETED
2005

VALUE AT COMPLETION
R67M

LOCATION
South Africa, Gauteng

PROJECT TYPE
Pipelines and Infrastructure