Portfolio

Our highlighted contracts and projects in progress . For all projects please click here.



Project Highlights

  • GROWTHPOINT LAKESIDE OFFICES DEVELOPMENT
  • ROSEBANK LINK
  • 92 RIVONIA ROAD
  • RUST DE WINTER
  • DISCOVERY HEAD OFFICE
  • PWC TOWER
  • TIME SQUARE AT MENLYN MAINE
  • ZEERUST
  • R24 RUSTENBURG
  • 140 WEST STREET JV
  • BALLITO JUNCTION
  • 2 PYBUS OFFICES
  • PALM VUE APARTMENTS CENTURY CITY
  • BRT - ANDERSON ROAD
  • ROSEBANK TOWERS
  • MENLYN MAINE CENTRAL SQUARE
  • OASIS PALM D’OR APARTMENTS
  • STATS SA
  • Sandton BRT - Integrated Rapid Public Transport Program
  • ACHIMOTA RETAIL CENTRE - GHANA
  • Kathu PV Solar Farm
  • 90 GRAYSTON DRIVE
  • REHABILITATION OF NACALA DAM
  • King Shaka airport
  • CTB - OR TAMBO AIRPORT
  • ONE AND ONLY HOTEL VILLAS & SPA
  • Gauteng freeway
  • ALICE LANE PHASE 3
  • SABLE PARK OFFICES

Roads and earthworks

All

  • WATT STREET INTERCHANGE
  • CLAIRWOOD PARK
  • SISHEN TSF
  • SALDANHA GREENFIELDS
  • RUST DE WINTER
  • ZEERUST
  • CAMDEN LINERS
  • Maguga Dam
  • CORNUBIA N2 OFFICE PARK BEW
  • R24 RUSTENBURG
  • BMK WATER MANAGEMENT
  • FINE ASH DAM 6 PHASE 1.1
  • BRT - ANDERSON ROAD
  • N1 Pedestrian Facilities
  • N4-6X – SECTION 6E – WATERVAL BOVEN
  • Sandton BRT - Integrated Rapid Public Transport Program
  • KUSILE COAL STOCK YARD
  • Go Durban - Integrated Rapid Public Transport Program
  • Shondoni Overland Conveyor Formation
  • Kusile Combustion Waste Terrace
  • Watson Highway Link Road
  • Rehabilitation Of Section EN4/2
  • Swartruggens - Phase One
  • Swartruggens N4 - Phase 2
  • HUSAB URANIUM MINE
  • Vale Tailings Storage Facility
  • N1 Ventersburg
  • Waterpan Colliery
  • Sasol Dams
  • Mopani Copper Mine
  • Beira Terminal
  • REHABILITATION OF NACALA DAM
  • Golden Ridge - Akyem (Ghana)
  • N2 interchange
  • Gauteng freeway
  • Gauteng freeway
  • N2 COOMBS
  • N4 Tollroad West
  • Trans Caprivi Highway
  • Zandamela Maxixe
  • Polokwane Bypass
  • Nelspruit Bypass
  • Mount Frere
  • King Shaka airport
  • Saldanha-Sishen
  • Ingula Dams
  • Orapa Services Dam (MotoCross)
  • Bergriver dam project
  • Ntimbale Dam
  • Matola Gas
  • Saspipe JV
  • AC Secondary Water Mains
  • Tanota Shashe
  • Tlokweng Water Supply & Sanitation Works
  • Karowe Mine
  • Unki mine
  • Mafube
  • Nkomati
  • Tenke mine
  • Lumwana
  • Nondela Drakensberg mountain estate
  • Ebotse
  • Mbabane bypass road
  • FAD6 BLUE SCOPE
  • N1 WINBURG
  • Ngwenya Border Post
    Ngwenya Border Post

    EMPLOYER
    Ministry of Public Works and Transport

    CONSULTANT
    Becom/OOP JV

    YEAR COMPLETED
    2003

    VALUE AT COMPLETION
    R358M

    LOCATION
    Swaziland

    PROJECT TYPE
    Toll Roads and Freeways

    DESCRIPTION
    A feature of this project was the excavation and protection of rock cuttings over a 10km length of mountainous terrain. Blasting of rock adjacent to the existing road was required and great importance was attached to the method of controlling this blasting to ensure the safety of the public and a minimum of disruption to the continuity of traffic flow. Stability of two large cuttings was achieved by installation of rock nails designed to prevent slippage or uncontrolled rock falls.Construction Involved the following: The rehabilitation & upgrading of 19.15km of the Mbabane / Ngwenya Road, (MR3) from single to dual carriageway & 46.8km of service roads. 7 No grade separation interchanges with bridges, 3000 m culverts, 6000m2 Reinforced Earth,1 No road-over-pass, 8 No Footbridges over the dual carriageway, 28 000m3 Concrete, 4 No Retaining Walls with total length of 112km,1 500 000m3 of Earthworks, 4 No cattle creeps in Reinforced Concrete, 30 000m3 Premix, 275 000m3 Selected Sub-grade, 95 000m3 Crushed Stone Base, 97 000m3 Ducting, 8 000m3 Sub-surface Drains. 


  • N4 Toll Road East

Road construction and rehabilitation

  • WATT STREET INTERCHANGE
  • RUST DE WINTER
  • ZEERUST
  • R24 RUSTENBURG
  • BRT - ANDERSON ROAD
  • N1 Pedestrian Facilities
  • N4-6X – SECTION 6E – WATERVAL BOVEN
  • Shondoni Overland Conveyor Formation
  • Watson Highway Link Road
  • Rehabilitation Of Section EN4/2
  • Swartruggens - Phase One
  • Swartruggens N4 - Phase 2
  • N1 Ventersburg
  • Beira Terminal
  • Golden Ridge - Akyem (Ghana)
  • Gauteng freeway
  • Trans Caprivi Highway
  • Zandamela Maxixe
  • Polokwane Bypass
  • Nelspruit Bypass
  • Mount Frere
  • N1 WINBURG

Bulk earthworks

  • CLAIRWOOD PARK
  • CORNUBIA N2 OFFICE PARK BEW
  • FINE ASH DAM 6 PHASE 1.1
  • KUSILE COAL STOCK YARD
  • Shondoni Overland Conveyor Formation
  • Kusile Combustion Waste Terrace
  • Waterpan Colliery
  • Golden Ridge - Akyem (Ghana)
  • FAD6 BLUE SCOPE

Mining

  • SISHEN TSF
  • FINE ASH DAM 6 PHASE 1.1
  • HUSAB URANIUM MINE
  • Mopani Copper Mine
  • Karowe Mine
  • Unki mine
  • Mafube
  • Nkomati
  • Tenke mine
  • Lumwana

Bridges and structures

  • SALDANHA GREENFIELDS
  • Sandton BRT - Integrated Rapid Public Transport Program
  • Go Durban - Integrated Rapid Public Transport Program
  • N2 interchange
  • Gauteng freeway
  • Mbabane bypass road

Dams

  • CAMDEN LINERS
  • Maguga Dam
  • FINE ASH DAM 6 PHASE 1.1
  • Vale Tailings Storage Facility
  • Sasol Dams
  • REHABILITATION OF NACALA DAM
  • Ingula Dams
  • Orapa Services Dam (MotoCross)
  • Bergriver dam project
  • Ntimbale Dam

Pipelines and infrastructures

  • BMK WATER MANAGEMENT
  • Saspipe JV
  • Tanota Shashe
  • Tlokweng Water Supply & Sanitation Works

Toll roads and freeways

  • N2 COOMBS
  • N4 Tollroad West
  • Ngwenya Border Post
    Ngwenya Border Post

    EMPLOYER
    Ministry of Public Works and Transport

    CONSULTANT
    Becom/OOP JV

    YEAR COMPLETED
    2003

    VALUE AT COMPLETION
    R358M

    LOCATION
    Swaziland

    PROJECT TYPE
    Toll Roads and Freeways

    DESCRIPTION
    A feature of this project was the excavation and protection of rock cuttings over a 10km length of mountainous terrain. Blasting of rock adjacent to the existing road was required and great importance was attached to the method of controlling this blasting to ensure the safety of the public and a minimum of disruption to the continuity of traffic flow. Stability of two large cuttings was achieved by installation of rock nails designed to prevent slippage or uncontrolled rock falls.Construction Involved the following: The rehabilitation & upgrading of 19.15km of the Mbabane / Ngwenya Road, (MR3) from single to dual carriageway & 46.8km of service roads. 7 No grade separation interchanges with bridges, 3000 m culverts, 6000m2 Reinforced Earth,1 No road-over-pass, 8 No Footbridges over the dual carriageway, 28 000m3 Concrete, 4 No Retaining Walls with total length of 112km,1 500 000m3 of Earthworks, 4 No cattle creeps in Reinforced Concrete, 30 000m3 Premix, 275 000m3 Selected Sub-grade, 95 000m3 Crushed Stone Base, 97 000m3 Ducting, 8 000m3 Sub-surface Drains. 


  • N4 Toll Road East

Airports, harbours and railways

  • King Shaka airport
  • Saldanha-Sishen

Golf courses

  • Nondela Drakensberg mountain estate
  • Ebotse

Building and construction

All

  • MENLYN MAINE RESIDENTIAL –  THE TRILOGY
  • GROWTHPOINT LAKESIDE OFFICES DEVELOPMENT
  • MILKWOOD SOCIAL HOUSING
  • ROSEBANK LINK
  • 92 RIVONIA ROAD
  • LOFTUS PARK
  • DISCOVERY HEAD OFFICE
  • PWC TOWER
  • TIME SQUARE AT MENLYN MAINE
  • SUMMERSTRAND STUDENT HOUSING
  • CCI OFFICES
  • ABSA REGIONAL HEAD OFFICE
  • 140 WEST STREET JV
  • THAVHANI MALL
  • BALLITO JUNCTION
  • 2 PYBUS OFFICES
  • PALM VUE APARTMENTS CENTURY CITY
  • ROSEBANK TOWERS
  • MENLYN MAINE CENTRAL SQUARE
  • OASIS PALM D’OR APARTMENTS
  • STATS SA
  • MALL OF AFRICA
  • Grain Silo
  • Seisa Ramabodu Stadium Upgrade
  • ACHIMOTA RETAIL CENTRE - GHANA
  • GROWTHPOINT ILLOVO OFFICES
  • SILO 3 4 5
  • Umhlanga Boulevard Office Development
  • FNB Umhlanga
  • OFFICES FOR WORLEY PARSONS
  • 85 GRAYSTON DRIVE
  • WEST HILLS MALL - GHANA
  • ALICE LANE PHASE 2
  • NEWTOWN JUNCTION
  • BREAKWATER APARTMENTS
  • LYNNWOOD BRIDGE PHASE 3
  • OASIS PALM ROYALE CENTURY CITY
  • 90 GRAYSTON DRIVE
  • ALICE LANE PHASE 1
  • STANDARD BANK
  • SILO NO 1 – ALLAN GRAY
  • ALEXANDER FORBES HEAD OFFICE
  • SANDTON CITY EXTENSIONS JV
  • MALL OF THE NORTH
  • LYNNWOOD BRIDGE 	DEVELOPMENT
  • 1 STATION PLACE / RADDISON BLU
  • MONTE CASINO BOULEVARD 	 HOTEL AND OFFICES
  • King Shaka airport
  • CTB - OR TAMBO AIRPORT
  • ONE AND ONLY HOTEL VILLAS & SPA
  • Moses Mabhida stadium
  • Peter Mokaba stadium
  • Cape Town stadium
  • Simbithi Golf Estate
  • ALICE LANE PHASE 3
  • SABLE PARK OFFICES
  • Gateway Shopping Centre
  • PPRust Workshops

Residential

  • MENLYN MAINE RESIDENTIAL –  THE TRILOGY
  • MILKWOOD SOCIAL HOUSING
  • SUMMERSTRAND STUDENT HOUSING
  • PALM VUE APARTMENTS CENTURY CITY
  • OASIS PALM D’OR APARTMENTS
  • BREAKWATER APARTMENTS
  • OASIS PALM ROYALE CENTURY CITY

Office and commercial buildings

  • GROWTHPOINT LAKESIDE OFFICES DEVELOPMENT
  • ROSEBANK LINK
  • 92 RIVONIA ROAD
  • DISCOVERY HEAD OFFICE
  • PWC TOWER
  • CCI OFFICES
  • ABSA REGIONAL HEAD OFFICE
  • 140 WEST STREET JV
  • 2 PYBUS OFFICES
  • ROSEBANK TOWERS
  • STATS SA
  • GROWTHPOINT ILLOVO OFFICES
  • SILO 3 4 5
  • Umhlanga Boulevard Office Development
  • FNB Umhlanga
  • OFFICES FOR WORLEY PARSONS
  • 85 GRAYSTON DRIVE
  • ALICE LANE PHASE 2
  • NEWTOWN JUNCTION
  • LYNNWOOD BRIDGE PHASE 3
  • 90 GRAYSTON DRIVE
  • ALICE LANE PHASE 1
  • STANDARD BANK
  • SILO NO 1 – ALLAN GRAY
  • ALEXANDER FORBES HEAD OFFICE
  • LYNNWOOD BRIDGE 	DEVELOPMENT
  • 1 STATION PLACE / RADDISON BLU
  • MONTE CASINO BOULEVARD 	 HOTEL AND OFFICES
  • ALICE LANE PHASE 3
  • SABLE PARK OFFICES
  • PPRust Workshops

Leisure, recreation, education

  • TIME SQUARE AT MENLYN MAINE
  • Moses Mabhida stadium
  • Peter Mokaba stadium
  • Cape Town stadium

Retail

  • THAVHANI MALL
  • BALLITO JUNCTION
  • MENLYN MAINE CENTRAL SQUARE
  • MALL OF AFRICA
  • ACHIMOTA RETAIL CENTRE - GHANA
  • WEST HILLS MALL - GHANA
  • SANDTON CITY EXTENSIONS JV
  • MALL OF THE NORTH
  • Gateway Shopping Centre

Hotels and resorts

  • Grain Silo
  • LYNNWOOD BRIDGE 	DEVELOPMENT
  • MONTE CASINO BOULEVARD 	 HOTEL AND OFFICES
  • ONE AND ONLY HOTEL VILLAS & SPA

Special projects

  • King Shaka airport
  • CTB - OR TAMBO AIRPORT

Golf estates

  • Simbithi Golf Estate

Civil engineering

All

  • Kusile Power Station main civil works
  • NP4 - NORTHAM PLATINUM FURNACE
  • TWINSAVER TISSUE MILL
  • RGB LINE ZAMBIA
  • ALRODE MALTING PLANT
  • Kusile power station
  • Ndola Lime Plant
  • Project MIA
  • Ressano Garcia Gas-Fired Power Station
  • North South Carrier 2
  • Kathu PV Solar Farm
  • TWEEFONTEIN OPTIMISATION PORTION A AND B
  • Project lion phase 2
  • Alrode Tank Farm
  • The Modular Tailings Treatment Plant