Growthpoint Lakeside offices development


Click image to enlarge

Employer: Growthpoint Properties Limited
Principal Agent: Glad Africa Project Managers (Pty) Ltd
Architect: AMA Architects
Contract Period: September 2017 – February 2019
Est. Value at Completion: ZAR 468m
Location: Centurion, South Africa

The construction of a 10 storey office development, comprising four basement levels and five office levels plus roof. Construction includes for the raft foundation and all works from bottom of raft excavation level, upwards. The overall GBA is 59 883m² with a building height of 35m. The internal atrium has an area of 385m² with a height of 23.5m. The triple volume reception has an area of 356m².

Umhlanga Boulevard Office Development

CLIENT
Growthpoint Properties Ltd

ARCHITECT/ENGINEER
Elphick Proome Architects

VALUE AT COMPLETION
ZAR 81 Million

LOCATION
Umhlanga Ridge – KZN

PROJECT TYPE
Building

DESCRIPTION
Construction of the new Boulevard Office Development comprising approximately 5500m2 of Offices and 10,000m2 of structured parking and related external works

CONTRACT PERIOD
March 2015 – April 2016

Silo 3,4,5

CLIENT
V&A WATERFRONT HOLDINGS (PTY) LTD

ARCHITECT/ENGINEER
MLC QUANTITY SURVEYORS

VALUE AT COMPLETION
ZAR 500 Million

LOCATION
V&A WATERFRONT, CAPE TOWN

PROJECT TYPE
Building

DESCRIPTION
The construction of 35000m2 of new office, gym &
residential space within the Clock Tower precinct of the V&A
Waterfront

CONTRACT PERIOD
March 2015 – September 2016

PWC Tower

CLIENT
Attacq Waterfall Investment Company (Pty) Ltd
Developer: Atterbury

ARCHITECT/ENGINEER
LYT Architects

VALUE AT COMPLETION
ZAR 700 Million

LOCATION
Waterfall City, Midrand, Johannesburg

PROJECT TYPE
Building

DESCRIPTION
New office block for Price Waterhouse Coopers, for Atterbury Properties.
Construction of 26 levels of office space (approx 44000 m2 GLA) as well as 6 levels of basement parking.

CONTRACT PERIOD
April 2015 – February 2018

90 Grayston Drive

The 90 Grayston Drive building is a 21 level office block development with 11 parking levels, 1 atrium level and 9 office levels. It is a multi-functional building with 19 343m2 of office space and 946 parking bays.
Contract Duration: October 2012 – July 2014
Contract Value: ZAR 280 Million
Engineers: Grosskopff Lombart Huyberechts & Associates
Client: Redefine Properties
Location: Sandton, Johannesburg

Lynnwood Bridge phase 3

Lynnwood Bridge phase 3 is the third and final phase of the Lynnwood Bridge complex. There are five basement levels and office accommodation in two 5-storey tower blocks built off the podium

Contract Duration:
August 2012 – August 2014

Contract Value:
ZAR 30 Million

Engineers:
Aurecon

Client: 
Lynnwood Bridge Office Park (Pty) Ltd

Location:
Lynnwood, Pretoria

Palm Royale

Palm Royale is a luxury retirement apartment building which forms part of the Oasis Retirement Resort at Century City, developed by Rabie Property Group. Consisting of 58 apartments and two parking garages and comprising 13 storeys, this building was specifically designed to cater for the elderly, with wide corridors and door openings, nursing facilities and tranquil, extensive landscaped gardens providing peaceful and secure living.

Contract Duration: November 2012 - May 2014

Contract Value: R105 Million

Architect : Ray Alexander Architects

Client:   Rabie Property Group

Location:Century City, Cape Town

Alice Lane – Phase 1

The Alice Lane development has set a new benchmark for iconic buildings on the Sandton Skyline. Not only does it have a unique design but it is also extremely functional as a multi-tenant and multi-use building.

Green Building:

Alice Lane Phase 1 is a Four Star rated Green Building. To achieve this and to ensure all tenant specifications and requirements were met, strict design and construction guidelines had to be followed. This was done with the assistance of "Solid Green".

Some "green" features are that grey water is collected in separation tanks and treated for the re-use as irrigation on the piazza area and that waste management has been designed for all tenants in the building.

Design innovation:

Composite Alco-panel and a double glazed unitized system were used to make the air-conditioning more efficient and to maximize the use of natural light which makes the building very energy efficient.

The main building is divided into two distinctly separate buildings linked together on one level by a super slab which was referred to by the Project Team as the "Leaping horse". The ground floor landscaping completes the "green" look of the building and makes extensive use of indigenous flora, natural floor finishes, timber composite walkways and paths and very detailed water features.

Contract duration:  
Feb 2012-July 2013

Contract value:  
R 284 Million

Architects: 
Paragon Architects

Client:
Abland  (Pty) Ltd

Location:    
Sandton, Jhb

Newtown Junction

The Newtown junction project is situated in the heart of Johannesburg, and can be seen from the M1 South highway. The project consists of a 4 level basement parking structure, two level shopping centre and 3 levels of office space above. Work commenced at the end of October 2012.

The project consists of 165 000m² of slabs and 60 000m³ of concrete and is the largest inner city development since the Carlton centre.

The project is situated adjacent to the Africa Museum and Market theatre where the preservation of the heritage associated with this part of Johannesburg is important. An example of this is the old potatoes sheds that are being refurbished to form part of the finished building and will house the food court and some restaurants.

Contract duration:
Oct 2012 - Oct 2014

Contract value:
R 800 Million

Architects:
DHK Architects LP Architects   

Client:
Atterbury Property Developments

Location:
Newtown, Jhb

Barloworld-Tete

Barloworld has a global footprint which now includes Tete. Barloworld's Tete Development consists of a parts warehouse and temporary offices designed for planned future expansion. The project is progressing well and is expected to be completed well ahead of schedule.

TThe earthworks team have cleared 35000m² of bush area in order to prepare the platform for the building team to commence their work. Some 13 000m² of open face excavations, cutting into the existing landscape was needed.

The facility will provide much needed assistance to the local contractors and plant hire businesses and will solve their considerable logistical problems.

Contract duration:
May 2013 - Nov 2013

Contract value:
$5.4Million

Engineer:
ADA Consulting

Client:
Barloworld Equipmentos

Location:
Tete, Mozambique