Cookie Consent by FreePrivacyPolicy.com

NEWS

2014

Temba Pipeline

By News 2014 No Comments

EMPLOYER
Roodeplaat Temba Water Services Trust

CONSULTANT
Temba Roodeplaat Consulting Consortium

YEAR COMPLETED

2005

VALUE AT COMPLETION
R67M

LOCATION
South Africa, Gauteng

PROJECT TYPE
Pipelines and Infrastructure

Nigel Prison

By News 2014 No Comments

EMPLOYER
Department of Public Works

CONSULTANT
WSP SA Civil & Structural Engineer

YEAR COMPLETED

2005

VALUE AT COMPLETION
R22M

LOCATION
South Africa, Gauteng

PROJECT TYPE
Bulk Earthworks

DESCRIPTION
Construction involved the following:The bulk earthworks, including stormwater, sewer and services roads for the construction of a new adult male medium security proto-type prison to accommodated 3000 inmates. Major Quantities: Cut to spoil for reduced levels 134 240m3, Imported G6 material 53 500m3, Cut to fill in terracing 115 600m3, Cut to fill in spoil platforms 72 500m3, Concrete to trapezoidal drains 788m3 750dia, Concrete pipe 430m.

Walker Drive Shopping Centre

By News 2014 No Comments

EMPLOYER
Hightower Properties

CONSULTANT
Bentel Associates

YEAR COMPLETED

2004

VALUE AT COMPLETION
R46M

LOCATION
South Africa, Eastern Cape, Port Elizabeth

PROJECT TYPE
Retail

DESCRIPTION
The 15,000m2 centre consists of a single-level mall with Pick n Pay as its main anchor, and a concrete-framed glass circular restaurant building three storeys high.

Oubaai Services

By News 2014 No Comments

EMPLOYER
MA Karafi

CONSULTANT
Kantley & Templer

YEAR COMPLETED

2005

VALUE AT COMPLETION
R90M

LOCATION
South Africa, Eastern Cape

PROJECT TYPE
Golf Courses

DESCRIPTION
The Contract comprises of the complete infrastructure construction for 322 upmarket serviced plots.Construction Involved the following:Internal Services:The Contract comprises of the complete infrastructure construction for 322 upmarket serviced plots. On completion 90 000m3 of material will be moved, 30 000m3 of selected layerworks, 80km of various service trenching, 1000m3 of concrete for sewer & seepage pumpstations poured and 55 000m2 of paving laid. Golfcourse:An Ernie Els Design, 18 hole championship golfcourse is currently under construction. 580 000m3 of material will be moved in various cut to fill exercises. Divisional Road 1590:Work involves the reconstruction of a single carriageway of approximately 3.2km of Divisional Road 1590. 60 000m3 of material is moved in cut to fill/spoil activities, 13 000m3 of selected layerworks, 5500m3 G2 crushed stone base, 29 000m2 Cape seal surfacing, stormwater drainage & 1900m2 concrete lined side drains will be constructed.

St Francis golf estate

By News 2014 No Comments

EMPLOYER
St Francis Golf Links (Pty) Ltd

CONSULTANT
Ninham Shand

YEAR COMPLETED

2006

VALUE AT COMPLETION
R72M

LOCATION
South Africa, Eastern Cape

PROJECT TYPE
Road Construction and Rehabilitation

DESCRIPTION
Construction work involved the following: 13 400m sewer reticulation, 12 700m water reticulation, 3000m stormwater pipe, 22 000m telkom sleeves, 72 000m2 paved (stabilized) internal roads + 13km, 3.7 Meg concrete reservoir, 300 000m3 Bulk earthworks (Scraper Team),40 000m2 Lined irrigation dam, Associated pump stations, spillways and gabion structures.

Ngwenya Border Post

By News 2014 No Comments

EMPLOYER
Ministry of Public Works and Transport

CONSULTANT
Becom/OOP JV

YEAR COMPLETED

2003

VALUE AT COMPLETION
R358M

LOCATION
Swaziland

PROJECT TYPE
Toll Roads and Freeways

DESCRIPTION
A feature of this project was the excavation and protection of rock cuttings over a 10km length of mountainous terrain. Blasting of rock adjacent to the existing road was required and great importance was attached to the method of controlling this blasting to ensure the safety of the public and a minimum of disruption to the continuity of traffic flow. Stability of two large cuttings was achieved by installation of rock nails designed to prevent slippage or uncontrolled rock falls.Construction Involved the following: The rehabilitation & upgrading of 19.15km of the Mbabane / Ngwenya Road, (MR3) from single to dual carriageway & 46.8km of service roads. 7 No grade separation interchanges with bridges, 3000 m culverts, 6000m2 Reinforced Earth,1 No road-over-pass, 8 No Footbridges over the dual carriageway, 28 000m3 Concrete, 4 No Retaining Walls with total length of 112km,1 500 000m3 of Earthworks, 4 No cattle creeps in Reinforced Concrete, 30 000m3 Premix, 275 000m3 Selected Sub-grade, 95 000m3 Crushed Stone Base, 97 000m3 Ducting, 8 000m3 Sub-surface Drains.

Maguga Access Road

By News 2014 No Comments

EMPLOYER
Komati Basin Water Authority

CONSULTANT
ZMCK

YEAR COMPLETED

1998

VALUE AT COMPLETION
R50M

LOCATION
Swaziland

PROJECT TYPE
Road Construction and Rehabilitation

DESCRIPTION
Piggs Peak and Swaziland.Construction Involved the following: Northern Access Road of 16km to allow access from the town of Piggs Peak to the proposed Maguga Dam site. Southern Access Road of 13.5km to allow access from Mbabane / Piggs Peak road to the new dam wall. Cut / Fill, Double Seal 13.2mm/6.7mm,Layerworks SSG/Subbase, Crushed Stone Base, Stone Pitched Base, Boulders / Rock 260 000m 3, Crusher, Cut / Spoil, Stabilised Base, Masonry Wall, Reinforced Earth.

Magugu Dam

By News 2014 No Comments

EMPLOYER
Komati Basin Water Authority (KOBWA)

CONSULTANT
MDJV (Ninham Shand, Keeve Steyn, Steffen Robertson & Kirsten & ZMCK)

YEAR COMPLETED

2001

VALUE AT COMPLETION
R420M

LOCATION
Swaziland

PROJECT TYPE
Dams

DESCRIPTION
Piggs Peak and Swaziland.Construction involved the following: Construction of the Maguga Dam, 6 million m3 of Earthworks, 2 tunnels (8m x 7m) & (8mx9m) & ±400m long, 225m long Road bridge over spillway,102m high 12 m ø Intake Tower, Rock Bolting & Shotcreting, Drilling & Grouting, Drill & Blast, Crushing, 120 000m3 concrete.

Trans Caprivi Highway

By News 2014 No Comments

EMPLOYER
Department of Transport, Namibia

CONSULTANT
VKE Namibia

YEAR COMPLETED

2000

VALUE AT COMPLETION
R159M

LOCATION
Namibia

PROJECT TYPE
Road Construction and Rehabilitation

DESCRIPTION
West / East Caprivi and Namibia. Construction Involved the following: Construction of 217 km single carriageway, 2-lane surfaced road, plus 47 km of gravel link roads. 1 530 000 m3 Sand fill,Pre-cast concrete drainage structures,745 000 m 3 Sand selected subgrade,3 In situ concrete access culverts,320 000 m3 Grave subbase,79 000 m 3 Gravel shoulders, 967 000 m 2 19.0 mm Single seal with asphalt,173 000 m3 Crushed G4, base course.