2015

PWC Tower

By News 2015

CLIENT
Attacq Waterfall Investment Company (Pty) Ltd
Developer: Atterbury

ARCHITECT/ENGINEER
LYT Architects

VALUE AT COMPLETION
ZAR 700 Million

LOCATION
Waterfall City, Midrand, Johannesburg

PROJECT TYPE
Building

DESCRIPTION
New office block for Price Waterhouse Coopers, for Atterbury Properties.
Construction of 26 levels of office space (approx 44000 m2 GLA) as well as 6 levels of basement parking.

CONTRACT PERIOD
April 2015 – February 2018

Oasis Palm D’or Apartments

By News 2015

CLIENT
The Oasis Joint Venture

ARCHITECT/ENGINEER
Raymond Alexander Architects

VALUE AT COMPLETION
R120 Million

LOCATION
Cape Town

PROJECT TYPE
Civils

DESCRIPTION
The work embodied in the contract comprises, the construction of 47 luxury apartments over 11 floors above two levels of undercover parking, 3 garden apartments, a sales/admin building of approximately 170m2 and landscaped gardens.

CONTRACT PERIOD
16 February 2015 – 6 June 2016

Worley Parsons

By News 2015

CLIENT
Cubimanzi Investments (Pty) Ltd

ARCHITECT/ENGINEER
BAM Architects

VALUE AT COMPLETION
R133 Million

LOCATION
Tygervalley Waterfront

PROJECT TYPE
Civils

DESCRIPTION
New Office development for Worley Parsons.
Construction of a new multi storey office block consisting of ten levels of offices and parking. Gross construction area is approximately 22,000m2

CONTRACT PERIOD
J31 May 2013 to 26 November 2014

Silo no 1 – Allan Gray

By News 2015

CLIENT
Lexshell 44 General Trading (Pty) Ltd

ARCHITECT/ENGINEER
VDMMA / RBA Joint Venture

VALUE AT COMPLETION
R480 Million

LOCATION
V & A Waterfront, Cape Town

PROJECT TYPE
Civils

DESCRIPTION
Allan Gray office Building comprised of various and channelling phases, from the construction of pre-cast concrete sheet piling, wall cutting of the adjacent ocean for the double story basement to very specialised demolition work. The No 1 Silo double story basement wraps around the existing Grain Silo building which is a National Monument. The Dust house had to be retained and this meant while linking the new buildings, the dust house was underpinned and supported in the air while the double story basement was excavated around and below the building. The main building comprises of the new corporate head office for Allan Gray and an apartment block comprising of 32 new apartments.

CONTRACT PERIOD
September 2011 to December 2012

Breakwater Apartments

By News 2015

CLIENT
V & A Waterfront Holdings (Pty) Ltd

ARCHITECT/ENGINEER
Louis Karol Architects

VALUE AT COMPLETION
R136 Million

LOCATION
V & A Waterfront, Cape Town

PROJECT TYPE
Civils

DESCRIPTION
It consists of a 4 Level, 150 apartment residential block with pool, landscaped gardens and tenant parking, as well as an extension to the Aston Martin and Maclaren showrooms below.

CONTRACT PERIOD
July 2013 to July 2014

Alrode Malting Plant

By News 2015

CLIENT
SAB Maltings (Pty) Ltd

ARCHITECT/ENGINEER
Hatch-Goba

VALUE AT COMPLETION
R150 Million

LOCATION
Alrode – Johannnesburg

PROJECT TYPE
Civils

DESCRIPTION
Construction of Malting Plant
Civil works for expansion of the existing fuel deport

CONTRACT PERIOD
May 2014 to March 2015

Project Lion phase 2

By News 2015

CLIENT
Glencore

ARCHITECT/ENGINEER
Greenblat and Hutton

VALUE AT COMPLETION
R345 m

LOCATION
Steelpoort Limpopo Province

PROJECT TYPE
Civils

CONTRACT PERIOD
July 2011 – April 2014

Alrode Tank Farm

By News 2015

CLIENT
SASOL

ARCHITECT/ENGINEER
VGI Consulting

VALUE AT COMPLETION
R 120 Million

LOCATION
Alrode – Johannnesburg

PROJECT TYPE
Civils

DESCRIPTION
Civil works for expansion of the existing fuel depot

CONTRACT PERIOD
February 2010 to March 2014

Tweefontein Civil Works

By News 2015

CLIENT
Glencore

ENGINEER
DRA

VALUE AT COMPLETION
R166m

LOCATION
Ogies Mpumalanga

PROJECT TYPE
Civils

DESCRIPTION
Construction of the raw coal handling and coal processing plant

CONTRACT PERIOD
Aug 2012 – April 2014

K6 Civil Works

By News 2015

CLIENT
Aquarius Platinum

ENGINEER
DRA

VALUE AT COMPLETION
R30 million

LOCATION
Rustenburg

PROJECT TYPE
Civils

DESCRIPTION
5 000 Tonnes Silo and Infrastructure.

CONTRAT PERIOD
May 2013 to May 2014.

2014

Limeco Resources Limited

By News 2014

Limeco Resources Limited is a limestone processing company situated approximately 30km west of Lusaka. Currently the company is in the planning stages to develop a limestone quarry and a processing plant to produce limestone aggregates, cement and quick lime for mainly their own needs at the Glencore mine in Zambia (Mopani) and in the Congo. Once completed and operating the planned output will be in the region of 350,000 tons per annum.WBHO was invited to tender and was awarded all major and critical structures on the project.

The scope of the work to be completed consists of the following areas:

  • Quick lime plant
  • Lime stone crushing and screening plant
  • Raw material storage and raw mill section
  • Blending and storage section
  • Kiln section cement
  • Clinker storage and cement mill section
  • Cement storage and packing section
  • Fuel fepot
  • Workshop building

Total concrete volume will be 4,000m3

Contract Duration: Nov 2013 – Sep 2014

Contract Value: ZAR 30 Million

Engineers: Protechglobal Consulting Services 

Client: Limeco Resources Limited

Location: Lusaka West, Zambia

Palm Royale

By News 2014

Palm Royale is a luxury retirement apartment building which forms part of the Oasis Retirement Resort at Century City, developed by Rabie Property Group. Consisting of 58 apartments and two parking garages and comprising 13 storeys, this building was specifically designed to cater for the elderly, with wide corridors and door openings, nursing facilities and tranquil, extensive landscaped gardens providing peaceful and secure living.

Contract Duration: November 2012 – May 2014

Contract Value: R105 Million

Architect : Ray Alexander Architects

Client:   Rabie Property Group

Location:Century City, Cape Town

Mall Of Africa

By News 2014

The new Mall of Africa development for Atterbury is the flagship retail development for Atterbury and is situated off the N1 Allandale Offramp in the Waterfall Precinct. The scale of the retail project is unprecedented in Africa, and is the largest retail development in Africa to be done in a single phase. The project is being undertaken in Joint Venture with Group Five.

Contract Duration: 28 Months

Contract Value: ZAR 2.2 Billion

Architect : MDS

Engineers: Aurecon      

Client:   Atterbury

Location:Allandale Offramp in the Waterfall Precinct.

Rehabilitation Of Section EN4/2

By News 2014

The contract entails the rehabilitation of 36 km of road by building a temporary shoulder, surfacing thereof and diverting traffic onto the newly built section. Thereafter in-situ milling of the existing sub-base and surfacing, to a depth of 300mm by adding bitumen and cement. This bitumen stabilized material (BSM) is then covered with a 150mm G1 base and surfaced with 45mm AE2 Medium mix.
The Load Control Area consists of the widening of an existing section of the road together with the construction of a new parking area. Two new weigh bridges will be constructed.

Contract duration:   October 2013 – October 2014

Contract value: ZAR 330 Million 

Engineers: SMEC and SNA

Client: TRAC

Location:Mohambe, Mozambique

Lafarge: Mapepe Aggregate Plant

By News 2014

WBHO recently secured work with Lafarge Zambia to construct the civil work associated with their new Crusher.

The scope of works consisted of:

  • Terrace (36 000m3) and ramp (19 000m3)
  • Foundations for the Conveyor and secondary crushers
  • Retaining wall of 35m long, 9.2m high and 1.2m thick (320m3 done in three night pours)
  • Cable trench and plinths
  • Water tank base
Contract duration:   July 2013 – January 2014

Contract value: ZAR 15.3 Million 

Client: Lafarge

Contractor: WBHO Construction Zambia Ltd

Location:Chilanga, outside Lusaka, Zambia

Acquisition of Securities by Old Mutual PLC on behalf of its Clients

By News 2014

WBO 201404230023A
Notification of Interest in Shares

Wilson Bayly Holmes-Ovcon Limited
(Incorporated in the Republic of South Africa)
(Registration number: 1982/011014/06)
Share code: WBO ISIN: ZAE000009932
(“WBHO”)

Acquisition of securities by Old Mutual PLC on behalf of its Clients

In accordance with Section 122(3)(b) of the Companies Act, No 71 of 2008 and Section 3.83(b) of the JSE Listing Requirements, shareholders are hereby advised that WBHO has received formal notification in the prescribed form that Old Mutual PLC has acquired an interest in the securities of the Company such that the total interest in the securities of the Company held by Old Mutual PLC has increased to 10.28% of the total issued share capital of the Company.

Johannesburg
23 April 2014

Sponsor: Investec Bank Limited

SeisaRamabodu Stadium

By News 2014

The project started in March 2013 and the WBHO team is working hard to complete the project on time and within budget. The scope of work consists of the demolition of the existing old-fashioned steel spectator structure, replacing it with a new state of the art concrete pavilion, a revamp of the existing grand stand and the installation of a modern IAAF standard tartan athletics track. This is truly a project which involves all fields of construction and integrates our earthworks, civil and building expertise. The work is being carried out by the WBHO Civil division.
Employer:   Free-State Department of Works

Contract value: ZAR 300 Million

Location:Rocklands, Bloemfontein.

Contract duration:March 2013 – February 2015

Acquisition of Securities by Sanlam Investment Management (Pty) Ltd on behalf of its Clients

By News 2014

BO 201404040027A
Interest in shares

Wilson Bayly Holmes-Ovcon Limited
(Incorporated in the Republic of South Africa)
(Registration number: 1982/011014/06)
Share code: WBO ISIN: ZAE000009932

Acquisition of securities by Sanlam Investment Management (Pty) Ltd on behalf of its Clients

In accordance with Section 122(3)(b) of the Companies Act, No 71 of 2008 and Section 3.83(b) of the JSE Listing Requirements, shareholders are hereby advised that WBHO has received formal notification in the prescribed form that Sanlam Investment Management (Pty) Ltd has acquired an interest in the securities of the Company such that the total interest in the securities of the Company held by Sanlam Investment Management (Pty) Ltd has increased to 5.05% of the total issued share capital of the Company.

Johannesburg
4 April 2014

Sponsor: Investec Bank Limited

The Modular Tailings Treatment Plant

By News 2014

The Modular Tailings Treatment Plant (MTTP) is a new diamond recovery plant for Debswana (De Beers and Government of Botswana) at their Jwaneng Mine, north-west of Gaborone, in Botswana. When completed, this plant will be utilized to reprocess all the existing tailings to recover further diamonds. Kalcon a subsidiary of WBHO was contracted for the civil and earthworks of the project which started on 4 February 2013 and is planned to be completed in March 2014.

Contract duration:  
12 months

Contract value:  
P 45 Million (Pula)

Consultants: 
ADP Projects

Client:
Debswana

Location:    
Jwaneng, Botswana

Alice Lane – Phase 1

By News 2014

The Alice Lane development has set a new benchmark for iconic buildings on the Sandton Skyline. Not only does it have a unique design but it is also extremely functional as a multi-tenant and multi-use building.

Green Building:

Alice Lane Phase 1 is a Four Star rated Green Building. To achieve this and to ensure all tenant specifications and requirements were met, strict design and construction guidelines had to be followed. This was done with the assistance of “Solid Green”.

Some “green” features are that grey water is collected in separation tanks and treated for the re-use as irrigation on the piazza area and that waste management has been designed for all tenants in the building.

Design innovation:

Composite Alco-panel and a double glazed unitized system were used to make the air-conditioning more efficient and to maximize the use of natural light which makes the building very energy efficient.

The main building is divided into two distinctly separate buildings linked together on one level by a super slab which was referred to by the Project Team as the “Leaping horse”. The ground floor landscaping completes the “green” look of the building and makes extensive use of indigenous flora, natural floor finishes, timber composite walkways and paths and very detailed water features.

Contract duration:  
Feb 2012-July 2013

Contract value:  
R 284 Million

Architects: 
Paragon Architects

Client:
Abland  (Pty) Ltd

Location:    
Sandton, Jhb